Bush Bound
All FAQs

How long does a vehicle fit-out take?

Direct Answer

Most builds take 8-12 weeks from deposit paid. Your vehicle is only with us for the installation phase, not the whole build. We'll give you a clear timeline during the consultation.

Why?

We've completed over a dozen builds across Troop Carriers, 4WDs and vans. The timeline depends on complexity - a drawer and bed setup is much quicker than a full expedition build with power, water and kitchen. Your vehicle isn't sitting in the workshop the whole time - we build the cabinetry before you drop it off, so your downtime is minimal.

Ready to get started?

Tell us about your vehicle and we'll give you a call to talk through the design and build something perfect for you.